Post by Bradford Traveller on Aug 31, 2021 0:20:12 GMT 1
DECEMBER 2021 • Service gap in the morning around Wakefield / Pontefract resolved Notably, the Huddersfield – Wakefield – Castleford service remains withdrawn save for three daily trains each way, apparently reflecting an ongoing staffing issue. * Resumption of hourly trains on the Halifax – Bradford – Leeds – Hull route. * Second hourly train introduced on the Knaresborough – York section of the Leeds – Harrogate – York line (i.e. 2tph throughout): stopper to run half-hourly through to York. This will include Sundays and most evening trains. * Additional trains on the Leeds – Skipton – Lancaster – Morecambe line via Bentham, new/restored journeys at: 07:25 Skipton–Carnforth only 09:41 Lancaster–Leeds 10:18 Leeds–Morecambe (and return) * Semi-fast trains Leeds – Wakefield Kirkgate – Barnsley – Sheffield increased back to twice hourly, with additional train running through after Sheffield to Lincoln. Sheffield – Lincoln: to start back at Leeds via Wakefield Kirkgate, however this will still be a stopper between Sheffield and Lincoln. TIMETABLES www.northernrailway.co.uk/travel/timetables
|
|
|
Post by Bradford Traveller on Sept 18, 2021 20:32:47 GMT 1
Network Rail will soon be starting work at upgrading the track through one of the oldest railway tunnels in the world. The 180-year-old Summit tunnel is on the line between Rochdale and Hebden Bridge.
The work is taking place between Saturday 23rd and Sunday 31st October (half term break) and the line will be closed for the nine days whilst the work takes place.
Rail replacement buses will be in operation Rochdale – Hebden Bridge, with buses replacing trains at the weekends between Manchester – Hebden Bridge and also Hebden Bridge – Accrington.
|
|
|
Post by MetrolineGA1511 on Sept 19, 2021 7:01:18 GMT 1
Network Rail will soon be starting work at upgrading the track through one of the oldest railway tunnels in the world. The 180-year-old Summit tunnel is on the line between Rochdale and Hebden Bridge. The work is taking place between Saturday 23rd and Sunday 31st October and the line will be closed for the nine days whilst the work takes place. Rail replacement buses will be in operation between Rochdale and Hebden Bridge, with buses replacing trains at the weekends between Manchester and Rochdale and also between Hebden Bridge, Burnley Manchester Road and Accrington stations. This will be the 2nd time recently that part of the line will have been closed for upgrade, after the 16 days in late July/early August.
|
|
|
Post by Bradford Traveller on Sept 19, 2021 8:30:28 GMT 1
This will be the 2nd time recently that part of the line will have been closed for upgrade, after the 16 days in late July/early August. No, in August the line was closed between Moston and Manchester Victoria for 16 days.
|
|
|
Post by MetrolineGA1511 on Oct 2, 2021 19:14:15 GMT 1
This will be the 2nd time recently that part of the line will have been closed for upgrade, after the 16 days in late July/early August. No, in August the line was closed between Moston and Manchester Victoria for 16 days. So, yes a different section but still disruption on the same line.
|
|
|
Post by Bradford Traveller on Oct 17, 2021 9:42:36 GMT 1
Buses replace trains Driffield–Bridlington–Scarborough between 23 and 31 October 2021
Network Rail will be undertaking major re-signalling works at Bridlington station and this requires the line between Driffield and Seamer to be closed for nine days.
|
|
|
Post by Bradford Traveller on Dec 23, 2021 21:45:37 GMT 1
REDUCED SERVICES 4 JANUARY until MAY 2022 Mondays to Fridays * North Bradford/Leeds Electrics One unit withdrawn, one journey CAN on all routes due to interworking (from 06:03 BDQ–SKI until 17:49 BDQ–ILK ) * Harrogate Line (all peak extras CAN ) * Hull – Halifax (reduced frequency) EVERY TWO HOURS * Huddersfield – Halifax – Bradford Reduced frequency EVERY TWO HOURS * Huddersfield – Castleford (peak only) 🚌 Rail replacement bus * Leeds – Knottingley (both routes) Various trips CAN approx every 90' * Leeds–Castleford–Sheffield 05:54 CAN * Sheffield–Moorthorpe–Leeds 22:15 CAN * Leeds–Halifax–Manchester 22:42 CAN TIMETABLES www.northernrailway.co.uk/travel/timetables
|
|
joseph
Forum Member
Posts: 1,138
|
Post by joseph on Dec 25, 2021 13:51:21 GMT 1
REDUCED SERVICES FROM 4 JANUARY * North Bradford Electrics Various journeys CAN on all routes due to interworking (from 06:03 BDQ–SKI until 17:49 BDQ–ILK ) * Harrogate Line (peak reductions) * Hull – Halifax (reduced frequency) EVERY TWO HOURS * Huddersfield – Bradford Reduced frequency EVERY TWO HOURS * Leeds–Manchester via Halifax 22:42 CAN * Huddersfield - Castleford (peak only) Rail replacement bus * Leeds - Knottingley (both routes) Various trips CAN approx every 90' Looking quickly at the temp timetables from 4th to 8th Jan, the Airedale line from Leeds looks to have one mid/late afternoon return working dropped, the Wharfedale sees a mid afternoon return working also dropped. The Harrogate line however sees a basic half hourly service all day with no peak extras, although the LNER services will compensate to a point. Additionally to the above, the lines via Sheffield are also affected, but again I think it's just some journeys cut rather than a frequency cut. It's apparently due to staffing issues but with only single workings cut, or peak extras that can't seriously be down to staffing can it?
|
|
|
Post by Bradford Traveller on Feb 16, 2022 22:29:21 GMT 1
|
|
|
Post by Bradford Traveller on Feb 19, 2022 11:25:41 GMT 1
Rail ticket prices across the UK will increase for tickets purchased on or after Tuesday 1 March 2022 in accordance with national guidelines for the rail industry.
|
|
|
Post by Bradford Traveller on Mar 8, 2022 13:33:47 GMT 1
MAY 2022 TIMETABLE Any changes to be notified below.
* Airedale Line (Bentham Line) 07:25 Skipton–Carnforth will start back at Bradford Forster Square 06:41.
08:10 until 23:11 Bradford Forster Square–Skipton–Bradford Forster Square reduced to hourly
* Wharfedale Line 07:47 until 19:46 Bradford Forster Square–Ilkley–Bradford Forster Square reduced to hourly
|
|
|
Post by deerfold on Mar 8, 2022 17:26:05 GMT 1
MAY 2022 TIMETABLE Any changes to be notified below. * Airedale Line (Bentham Line) 07:25 Skipton–Carnforth will start back at Bradford Forster Square 06:41. 08:10 until 23:11 Bradford Forster Square–Skipton–Bradford Forster Square reduced to hourly * Wharfedale Line 07:47 until 19:46 Bradford Forster Square–Ilkley–Bradford Forster Square reduced to hourly I've been travelling between Keighley and Lancaster a bit recently and hadn't realised there was a service which only went to Carnforth. Rather bizarrely it currently seems to run empty from Leeds to Skipton and then again from Carnforth to Lancaster (though gets there after the next service from Carnforth). Do you know if the Bradford cuts are down to staff shortages or fewer passengers?
|
|
|
NORTHERN
Mar 8, 2022 21:52:20 GMT 1
via mobile
Post by adam on Mar 8, 2022 21:52:20 GMT 1
They can't get a passenger path from Leeds to Skipton hence why currently it starts at Skipton and from May will start at Bradford.
|
|
|
Post by deerfold on Mar 8, 2022 22:18:32 GMT 1
They can't get a passenger path from Leeds to Skipton hence why currently it starts at Skipton and from May will start at Bradford. Yes, it was the other end that seemed odder.
|
|
|
NORTHERN
Mar 9, 2022 10:23:16 GMT 1
via mobile
Post by adam on Mar 9, 2022 10:23:16 GMT 1
From another forum there's no path to get from Carnforth to Lancaster without spending 10 mins in the loop. It has to get out before the Avanti Glasgow to Euston but the northern can't run all the way as it'll delay the avanti, but has to clear Carnforth to let the Barrow to Man Air out, so they bob it in the Goods Loop and it follows the Man Air into Lancaster
|
|
|
Post by deerfold on Mar 9, 2022 11:53:10 GMT 1
From another forum there's no path to get from Carnforth to Lancaster without spending 10 mins in the loop. It has to get out before the Avanti Glasgow to Euston but the northern can't run all the way as it'll delay the avanti, but has to clear Carnforth to let the Barrow to Man Air out, so they bob it in the Goods Loop and it follows the Man Air into Lancaster Indeed - was that the answer to my question there? I'm guessing the two ECS parts seriously diminish its attractiveness. Extending to Bradford may help a little.
|
|
jst
Forum Member
Posts: 211
|
Post by jst on Mar 9, 2022 15:40:38 GMT 1
It does at least provide a reasonable <10 minute same platform connection into the service from Barrow to Lancaster and Manchester. Attempts were made to get the Goods Loop passenger certified to allow a through service to operate, albeit slower and overtaken, but it wasn't possible.
There have been occasions where the service from Barrow has been cancelled that the ex Skipton service has picked up its path and run to Lancaster in service ensuring that connections could be met.
|
|
|
Post by Bradford Traveller on Mar 21, 2022 5:14:33 GMT 1
MAY 2022 TIMETABLE The currently reduced service on some routes including Halifax–Bradford, and Huddersfield–Wakefield, is unfortunately retained in the new timetable. There are service reductions on other local routes.
* Airedale (Bentham Line) Bradford–Skipton–Bradford reduced to hourly 08:10 to 23:11. 07:25 Skipton–Carnforth will start back at Bradford Forster Square 06:41. Leeds–Skipton–Leeds full timetable restored including the peak extra 07:30 ex Skipton and 17:40 ex Leeds.
* Calder Valley Bradford–Huddersfield–Bradford Interchange is EVERY TWO HOURS Hull–Halifax–Hull EVERY TWO HOURS
*Hallam (Barnsley Line)
* Harrogate Line First train from Harrogate to Leeds (currently 06:07) is later at 06:56. There may be gaps in service throughout the day.
* Wakefield Line Sheffield–Leeds–Sheffield via Moorthorpe: three trips CAN 08:15 to 15:48
* Wharfedale Bradford–Ilkley–Bradford reduced to hourly 05:46 to 19:46. Leeds–Ilkley–Leeds full timetable restored
|
|
Username
Forum Member
I need to get my eyes checked, I've just seen a Streetlite and my eyes are burning
Posts: 1,012
|
Post by Username on Mar 21, 2022 20:03:50 GMT 1
MAY 2022 TIMETABLE The currently reduced service on some routes including Halifax–Bradford, Huddersfield–Wakefield, and Leeds–Knottingley is unfortunately retained in the new timetable. * Airedale (Bentham Line) Skipton–Leeds full timetable restored including the peak extra 07:30 ex Skipton and 17:40 ex Leeds. 07:25 Skipton–Carnforth will start back at Bradford Forster Square 06:41. 08:10 until 23:11 Bradford–Skipton–Bradford hourly * Calder Valley Bradford–Huddersfield–Bradford Interchange is EVERY TWO HOURS Hull–Halifax–Hull EVERY TWO HOURS * Harrogate Line First train from Harrogate to Leeds (currently 06:07) is later at 06:56. There may be gaps in service throughout the day. * Wharfedale Leeds–Ilkley–Leeds full timetable restored 07:47 until 19:46 Bradford–Ilkley–Bradford reduced to hourly Is cutting the Calder Valley Line a good decision? The Calder Valley Line is the second most busiest Railway Line in West Yorkshire with trains struggling when it comes to 3 car trains running every 15 minutes from Hebden Bridge to Leeds (with exception of Mythlomroyd, Sowerby Bridge and Low Moor.
|
|
|
Post by westyorkshirebus on Mar 21, 2022 20:26:42 GMT 1
Do you have any info to back up your claim that it’s the second busiest?
|
|
WYBS
Forum Member
Watch-o
Posts: 1,489
Member is Online
|
NORTHERN
Apr 12, 2022 12:53:52 GMT 1
via mobile
Post by WYBS on Apr 12, 2022 12:53:52 GMT 1
195103 and 195109 are currently coupled together in Leeds working the 12:44 to Chester. I didn't know 6 cars could work this route, I know New Pudsey will only take 4 cars.
|
|
|
Post by Bradford Traveller on Apr 13, 2022 23:40:53 GMT 1
195103 and 195109 are currently coupled together in Leeds working the 12:44 to Chester. I didn't know 6 cars could work this route, I know New Pudsey will only take 4 cars. The sets working the 12:42 and 13:12 ex Leeds were coupled together Leeds–MCV, calling at the stops of the 12:42 but running in the path of the 13:12 (due to staffing difficulties). I have been on a 6-car set, only the front door of the rear set is opened at stations.
|
|
|
Post by Bradford Traveller on May 15, 2022 8:43:42 GMT 1
New timetables start today. There may be further amendments from those posted above. Please note that the reductions to/from Bradford Forster Square will apply additionally in the mornings. www.northernrailway.co.uk/travel/timetables
|
|
|
Post by Bradford Traveller on May 15, 2022 8:57:12 GMT 1
MAY 2022 TIMETABLE
The currently reduced service on some routes including Halifax–Bradford, and Huddersfield–Wakefield, is unfortunately retained in the new timetable. There are service reductions on other local routes.
* Airedale (Bentham Line) Bradford–Skipton–Bradford reduced to hourly 07:11 to 23:11. 07:25 Skipton–Carnforth will start back at Bradford Forster Square 06:41. Leeds–Skipton–Leeds full timetable restored including the peak extra 07:30 ex Skipton and 17:40 ex Leeds.
* Calder Valley Bradford–Huddersfield–Bradford Interchange is EVERY TWO HOURS Hull–Halifax–Hull is EVERY TWO HOURS
*Hallam (Barnsley Line) — some reductions, not had chance to study this
* Harrogate Line First train from Harrogate to Leeds (currently 06:07) is later at 06:56. There may be gaps in service throughout the day.
* Wakefield Line Sheffield–Leeds–Sheffield via Moorthorpe: three trips CAN 08:15 to 15:48
* Wharfedale Bradford–Ilkley–Bradford reduced to hourly 05:46 to 19:46. Leeds–Ilkley–Leeds, apart from 0833 between Leeds and Ilkley, full timetable restored
|
|
|
Post by Burnside on May 15, 2022 18:50:19 GMT 1
On the Wharfedale, the hourly service doesn't kick in until after 08:22 from Ilkley and 08:47 from Bradford. The usual times apply until then.
Likewise, while the 14:03 from Leeds to Ilkley and 14:40 Ilkley to Leeds are retored, the 07:56 from Ilkley and 08:33 from Leeds are withdrawn.
|
|